Sistemi ta' Kwalità tal-Funderija: PPAP, APQP, FAI, NDT & IATF 16949

IT-18-IL ELEMENT TAL-PPAP LIVELL 3 GĦALL-FUNDERIJI

When qualifying a foundry for high-volume serial production (automotive engine blocks, heavy equipment transmissions, or hydraulic manifolds), STALFE requires a complete PPAP Level 3 Dossier (QAI-001). Below is the exact operational requirement for each of the 18 mandatory PPAP elements.

Numru u Isem tal-Element PPAP Kontenut Tekniku Obbligatorju u Dokumentazzjoni Meħtieġa STALFE Kriterji ta' Aċċettazzjoni (Devjazzjoni Żero)
1. Rekords tad-Disinn u Mudelli CAD Approved 2D engineering drawings (PDF) and 3D CAD models (STEP) annotated with ISO 8062 CT8 tolerances and GD&T datums (A-B-C). Ittra ta 'reviżjoni tat-tpinġija eżatt ittimbrata u verifikata kontra l-ordni tax-xiri tal-klijent.
2. Dokumenti tal-Bidla tal-Inġinerija Any documented engineering change notes (ECN), deviation authorizations, or concessions agreed between STALFE and OEM buyer. Iffirmat bis-sħiħ mill-inġinier kap tal-klijent qabel it-tferrigħ tal-moffa FAI.
3. Approvazzjoni tal-Inġinerija tal-Klijent Written sign-off from STALFE engineering approving the pattern layout, gating/risering simulation (MAGMASOFT), and parting line location. Is-simulazzjoni MAGMASOFT trid turi żero spots sħan ta 'jinxtorob tal-linja ċentrali ġewwa bosses kritiċi.
4. Design FMEA (DFMEA) Systematic analysis of potential part design failures under mechanical fatigue, hydrostatic pressure (500 bar), or thermal shock. Risk Priority Number (RPN) must be < 100 for all critical operating modes.
5. Process Flow Diagrams (PFD) Immappjar viżwali minn tarf sa tarf tal-proċess tal-funderija: ċarġ tar-ruttam -> tidwib tal-induzzjoni elettrika -> OES -> tferrigħ -> shakeout -> shot blast -> tidwir CNC -> CMM -> NDT -> ippakkjar. Għandu jinkludi l-gradi kollha ta' verifika ta' spezzjoni deħlin, fil-proċess u finali.
6. Process FMEA (PFMEA) Rigorous analysis of manufacturing failure risks (e.g., core shift during pouring, damp sand causing gas porosity, or OES drift). Must incorporate automated Poka-Yoke checks (e.g., core setting alignment pins and automated radiation monitors).
7. Control Plan (CP) The master operational inspection schedule specifying check frequency, gauge type, and corrective action (CAPA) for every process step. Must mandate 100% CMM sampling on first 5 parts and hourly green sand moisture checks (3.0 - 3.5%).
8. Measurement System Analysis (MSA) Studji Statistiċi Gage R&R li saru fuq is-CMMs, il-mikrometri tal-bore, u l-kalipers kollha użati biex jiċċekkjaw id-dimensjonijiet kritiċi tat-tpinġija. Gage Repeatability & Reproducibility (Gage R&R) percentage must be ≤ 10.0%.
9. Dimensional Results (CMM Layout) Complete 100% dimensional inspection reports on 5 to 6 consecutive First Article Inspection (FAI) castings measured across all CAD features. All dimensions must fall within ISO 8062 CT8-CT10 raw casting or H7 machined tolerance bands.
10. Rapporti tal-Materjal u Metallurġiċi Certified laboratory test reports: OES chemical composition (% C, Si, Mg, Cr, Mo), tensile/yield tests from cast bars, and nodularity image analysis (ISO 945-1). Must prove Nodularity ≥ 85% (ductile iron) and tensile yield properties conforming to EN 1561 / EN 1563 (EN 10204 Type 3.1 signed by independent QA).