DE 18 ELEMENTEN VAN PPAP NIVEAU 3 VOOR GIETERIJEN

When qualifying a foundry for high-volume serial production (automotive engine blocks, heavy equipment transmissions, or hydraulic manifolds), STALFE requires a complete PPAP Level 3 Dossier (QAI-001). Below is the exact operational requirement for each of the 18 mandatory PPAP elements.

PPAP-elementnummer en naam Verplichte technische inhoud en documentatie vereist STALFE Acceptatiecriteria (nulafwijking)
1. Ontwerprecords en CAD-modellen Approved 2D engineering drawings (PDF) and 3D CAD models (STEP) annotated with ISO 8062 CT8 tolerances and GD&T datums (A-B-C). Exacte revisiebrief van de tekening, gestempeld en geverifieerd op basis van de inkooporder van de klant.
2. Technische wijzigingsdocumenten Any documented engineering change notes (ECN), deviation authorizations, or concessions agreed between STALFE and OEM buyer. Volledig ondertekend door de hoofdingenieur van de klant voorafgaand aan het gieten van de FAI-matrijs.
3. Goedkeuring door de klant Written sign-off from STALFE engineering approving the pattern layout, gating/risering simulation (MAGMASOFT), and parting line location. MAGMASOFT-simulatie moet geen hotspots voor krimp in de middenlijn binnen kritische bazen laten zien.
4. Design FMEA (DFMEA) Systematic analysis of potential part design failures under mechanical fatigue, hydrostatic pressure (500 bar), or thermal shock. Risk Priority Number (RPN) must be < 100 for all critical operating modes.
5. Process Flow Diagrams (PFD) End-to-end visuele mapping van het gieterijproces: schrootlading -> elektrisch inductiesmelten -> OES -> gieten -> shakeout -> kogelstralen -> CNC draaien -> CMM -> NDT -> verpakking. Moet alle verificatiepoorten voor inkomende, lopende en definitieve inspecties omvatten.
6. Process FMEA (PFMEA) Rigorous analysis of manufacturing failure risks (e.g., core shift during pouring, damp sand causing gas porosity, or OES drift). Must incorporate automated Poka-Yoke checks (e.g., core setting alignment pins and automated radiation monitors).
7. Control Plan (CP) The master operational inspection schedule specifying check frequency, gauge type, and corrective action (CAPA) for every process step. Must mandate 100% CMM sampling on first 5 parts and hourly green sand moisture checks (3.0 - 3.5%).
8. Measurement System Analysis (MSA) Statistische Gage R&R-onderzoeken uitgevoerd op alle CMM's, boormicrometers en schuifmaten die worden gebruikt om kritische tekeningafmetingen te controleren. Gage Repeatability & Reproducibility (Gage R&R) percentage must be ≤ 10.0%.
9. Dimensional Results (CMM Layout) Complete 100% dimensional inspection reports on 5 to 6 consecutive First Article Inspection (FAI) castings measured across all CAD features. All dimensions must fall within ISO 8062 CT8-CT10 raw casting or H7 machined tolerance bands.
10. Materiaal- en metallurgische rapporten Certified laboratory test reports: OES chemical composition (% C, Si, Mg, Cr, Mo), tensile/yield tests from cast bars, and nodularity image analysis (ISO 945-1). Must prove Nodularity ≥ 85% (ductile iron) and tensile yield properties conforming to EN 1561 / EN 1563 (EN 10204 Type 3.1 signed by independent QA).